Pages

Senin, 02 Januari 2017

update on the 60 claro slab

all in, all done ... i had to take pictures of this one three different times before i finally got it right, but it was worth it ... this is a really wide piece of walnut and its kind of unlikely ill get one like it again. click the photos to enlarge them ...
you can see a little more of the base here ...
and in this shot, some of the natural defects (ant trails) that we left in the finished piece ...
and heres the photo from my supplier, good hope hardwoods, that i sent to the potential client to seal the deal.
and here is sams fabricating/welding jig that he used when building the trapezoidal shapes for the base verticals ... those he connected with 2.5" angle iron which gave us a rigid, independent base structure which we will remove for shipping ...
this table top had some miles on it before we finished, and it was no picnic to move it .. it started in california somewhere, went to pennsylvania, to dorset and the woodshed at my house, moved to the garage, from there to the shop for final smoothing and sanding, and then to the finish room on a special cart we built to get it out the door .. going down the 2 high 8 long ramp from the front steps of the shop was thrilling.
across the drivechoice was a piece of cake comparatively ... jim is actually on tiptoes here ...
and here you can see the cart and the more relaxing ramp into the finish room ...
where it went through its usual paces ... off to aspen this week, or maybe el paso first.

Related Posts by Categories

0 komentar:

Posting Komentar