Pages

Tampilkan postingan dengan label church. Tampilkan semua postingan
Tampilkan postingan dengan label church. Tampilkan semua postingan

Selasa, 06 Desember 2016

metal shop update

the sheetrocks taped and painted.  the doors are (finally) hung so that they open all the choice .. that was dans job and it took him until today to get it all figured out ... waiting now only for the concrete slab for the storage shed for the steel and the rest of the siding, which should be installed next week 
or the week after .. getting close now ... more metal shop photos here.
 they open all the choice ...
 
 they close all the choice and the transom glass is in now ... time for interior trim ..
and its high foliage fall in vermont, and the weather for the last two weeks has been superb.
 
Read More..

Jumat, 18 November 2016

church railings

tah dah ...
 the church railings are now installed .. it was a bit of a process, as its in the historic district and permits were required, but they are looking good.  there will be  a removable center section later ..
concept to completion
 existing rails, probably from the 50s?
photoshopped mockup
pattern test
build jig
 it was a process
 
final fitting before paint and installation
Read More..