
the sheetrocks taped and painted. the doors are (finally) hung so that they open all the choice .. that was dans job and it took him until today to get it all figured out ... waiting now only for the concrete slab for the storage shed for the steel and the rest of the siding, which should be installed next week
or the week after .. getting close now ... more metal shop photos here.

they open all the choice ...

they close all the choice and the transom glass is in now ... time for interior trim ..

and its high foliage fall in vermont, and the weather for the last two weeks has been superb.












All in, all done ... Sam and Jim wrapped it up today with a little more on site bolting and welding .... Id like to see it in person before the folks move in though Sams pictures came out well considering what a sunny house it is ... I think hes happy it all fit and its all done, and the biuilder came by with the check
Up the steps
Top of the steps ...
Ditto ...
Down the steps
Sams secret, super special, leopard skin finish ... very cool
Next !